Daily journal

9/25/24


-Begin our progression through certificate module


-Whole team made it through 3 certificate modules 

11/20/24


-We were tasked to design and 3d print a do-nothing machine.
-Whole team has designed and printed out a do-nothing machine.

1/16/25

-Come to a consensus with the team and get set up a new website which allows to collaborate.
-Whole team is now on the same page with our website


1/27/25


-Keep progression for certificate modules steady
-Good progression towards certificate was made


1/29/25
-Ran into issues with current website, we will find one that allows for complete collaboration.


-Found a website which all can access and use.


1/31/25


-Helped with tending to 3d printer.


-We were able to transfer the ABS to original spool.





2/6/25


-Catch up on certificate modules. 


-Made enough progress for most of the team to catch up 
2/10/25


-Continue progression towards certificate modules
-Whole team has made through three certificate modules.


2/12/25


-Have collective notable progression in certification acquisition


-Each member successfully completed a module


2/14/25


-Continue progression towards certificate


-Have reached the 30-certificate module benchmark.
2/20/25



-Discuss website plans 
-Practicing organic multi-view/ isometric drawings
-Practicing Mechanical multi-view/ isometric drawings


-Found a website to use as reference 
-Created a few organic perspective/ multi-view drawings

-Began mechanical sketch for new project

2/24/25


-Continue progression for certificate
 
-Made it through 5 certification modules.


2/26/25


-The team would test out configurations of the website


-Had many tests done so that we can see what was ideal


2/28/25


-Refine the website and remove inconsistencies


-Minor aesthetic alterations on home page and photo gallery and addition of Insight page


3/6/25


-Work on the modules in Solidworks training


-Got 3 modules done 


3/10/25


-Solidworks packet; finish task 1 


-We were able to finish the first task


3/12/25


-No work  Field Trip


-No work


3/14/25


-Work on the Soildworks assignment; get task2 done


-We got task 2 done


3/18/25


-We plan to work on the Solidworks assignment 


-Worked a little on the assignment 


3/28/25


-We plan get 60% done with the Solidworks assignment  


-Worked a little on the assignments


4/1/25 


-We plan to work to get 3 Soildworks assignments done


-We completed 3 assignments each

-Provided a rough estimates and guiding advice to a trebuchet Master Project

4/3/25


-We plan to get another one of the models done from the packet

-plan to correct or provide more accurate measurements and figures

-We were able to get one and a half done

-We provided research and calculations to a trebuchet master project

4/14/25


-We want to get a few more certification assignments done, so we can now how to work on the next packet thing.


-We accomplished our goal and were able to get a few more then we thought we would done.


4/16/25


-We want to complete one assignment from the packet 


-We completed our goal


4/18/25


-Today we plan to work on the assignments from the packet 


-We completed one of the assignments
-We modeled 2 and printed 3 parts for the Rube Goldberg machine.


4/22/25 


-Work on Refining additional website features


-Added visual content to content page and made framework for Future progress


4/24/25 


-Make consistent theme across website and finished Insight portals


-Something


/ / 


-Something


-Something